Search results

  1. J

    Is this a new circut or a spur?

    about 50 out of the 20 million or so that exist :lol:
  2. J

    Notifiable jobs - how much hassle??

    First fix inspection with everthing on display (cable runs, joist drillings etc), then as long as they are happy, close up, final inspection and testing, and sign off has been my experiance.
  3. J

    Plans for rewire.

    An Over zealous BCO I am afraid, here is a quote from the ODP regarding Part P inspection:- Local authority charges for Part P work Local authorities should ensure that charges for checking full plans applications or building notices and carrying out inspections of building work, including...
  4. J

    Plans for rewire.

    Each individual BCO seems to make it up as they go along, their role is to make sure your work is compliant with your application after you have done it, what he is doing is trying to create a half way house between a full planning application and BCO inspection which does not actually exist...
  5. J

    What happens when it floods ??

    If water is such a poor conductor, then contrary to all the movies if someone throws the classic electric fire or hairdryer in the bath with you as long as you are not in direct contact with it (and assuming the bath is metal and is bonded) are we saying you won't be electrocuted? Not that I...
Back
Top