  1. R

    GRP roofing

    Lmatting was 450gr, cure it grp roof.
  2. R

    GRP roofing

    He basically put Osb, then resin then matting ( no bandage ) then resin, when it dried he sand it , then applied resin again. Then when it dried sanded it applied topcoat. When topcoat was dry he sanded it and applied topcoat. Then sanded it when it dried and applied topcoat again.
  3. R

    GRP roofing

    Thank you for quick response. He applied resin. My concern mostly about bandage along Osb joints before laminating. As it was not t&g Osb.
  4. R

    GRP roofing

    hello, we recently changed the flat alsphalt roof with GRP system. the builder used OSB 3 but not T and G. He also did not apply bandage inbetween the joints. However, he applied two times resin on top of laminate/mat and three times topcoat (he sanded every time he applied the coat). will it...