Search results

  1. R

    Circuit extension

    They will go through the brick wall within 1 inch max from the ceiling. Ie if they drop down the wall at all, it will only be for 1 inch maximum.
  2. R

    Circuit extension

    Will junction boxes in the loft space be OK?
  3. R

    Circuit extension

    It's not possible to replace the entire lengths of cable as they drop down from under the bedroom above. However, I propose to push them into the roof space of the single storey extension and attach the juction boxes in there. They would be accessible via the loft hatch.
  4. R

    Circuit extension

    We are extending our kitchen into the adjacent single-storey room. We have 3 sockets on the wall that is to be removed. These cables drop down from the ceiling space - the house is 15 years old. I don't want to get the floor up in the bedroom above the kitchen, so is it OK (within regs) to push...
Back
Top