    House extension quote seems exessive

    took about 3 weeks dug footings concreted, dpm, screeded floor and brick and block dwarf wall with upvc il get some pics uploaded this week
  2. W

    House extension quote seems exessive

    i was in the building trade for 3 years did my ND in building work before i changed profession in to IT ive recently built a 4 x 3 porch was quoted 7k managed to do it myself for 3k so ive got the know how to butter a brick and whats involved i can do the internals plastering skirting...
  3. W

    House extension quote seems exessive

    i can get a roofer to take down the existing roof and get the flat roof fitted be flashed and felted and sealed i reckon labour for the bricky will be about £6300 thats working on the assumtion it will take 45 days about 8 weeks on the day rate of 140. brick and block will cost £947...
  4. W

    House extension quote seems exessive

    does anyone have a ball park figure for materials for a similar job. wondering if it may be better hiring a bricky in for the block work and a roofer or joiner for the respective work seprate.
  5. W

    House extension quote seems exessive

    based on approved drawings and a similar job carried out by the builders it will be a flat roof
  6. W

    House extension quote seems exessive

    looking to get a house extension built on top of a ground floor extension that is already built its roughly 9 metres by 4 metres so 36 squared metres this will add 2 extra bedrooms to the house. the foundations on the orignal extensions to my knowledge will hold the weight of the...