Hi all,
I am getting a dormer done in east london, the plan appraisal has flagged up that 1st floor ceilings need to be fire rated 30 minutes. Builder is now under the beleif that the existing ceilings will need to be taken down and replaced with 30 minute fire rated plasterboards. He has...