Hey Wayners,
Thanks for the reply, for the slab it will be 150 MOT, 150 Concrete slab with A142 Mesh as specified by the structural engineer, 150 PIR and then 50 screed on top, with the relevant DPMs in place, I’m just wondering how to secure that remaining slab which that wall is sitting on...