Search results

  1. P

    Can I obtain a completion certificate if only part of a planning approved build was carried out?

    We obtained planning permission and Building reg approval to remove a wall between the kitchen and dining room plus building a new extension to the kitchen. The builder called up BC who came out to inspect the Catnic once it was in position supporting the upper floor where the wall was removed...
  2. P

    Can I obtain a completion certificate if only part of a planning approved build was carried out?

    We obtained planning permission and Building reg approval to remove a wall between the kitchen and dining room plus building a new extension to the kitchen. The builder called up BC who came out to inspect the Catnic once it was in position supporting the upper floor where the wall was removed...
  3. P

    Is there a damp proof membrane in a 60's house's concrete floor?

    Hello all, We have a 10 year old downstairs shower set on the existing concrete floor of a 60's house. We have had signs of dampness on the other side of the wall which we think was probably caused by the failure of the tile grouting which is now dry. It had not been used for over a year to...
Back
Top