Hi All, looking for some advice please....
I have a gravity fed system with a Trevi Boost Venturi shower valve and also a basin tap on the ground floor and the hot water supply is delivered over an approx. 20m long 22mm pipe run. The HW tank is on the first floor and this is fed from a CWT...