Search results

  1. S

    Existing drainage through concrete footing

    I am doing some alterations which involve casting existing drainage into a new foundation. The existing drain runs perpendicular to the strip footing, which has been designed by a structural engineer (me). My question is how do you go about actually sleeving the pipe through the footing...
  2. S

    Retrofitting restraint straps to joists in existing 9inch brick wall

    I am a structural engineer looking to retrofit some new joists with restraint straps in an Existing 9 inch solid wall. The joists will span onto the face of a new wall plate bolted to the face of the existing wall at 400mm c/c. Always like to hear builders’ opinions on these things, as I like to...
Back
Top