Search results

  1. T

    Order of works

    Just need some comfort about the order of works being proposed by my builder. The two storey extension structure is up and the roof battened and about half-tiled, with the first floor down and all of the first floor studwork in place. Windows have not gone in and the knock through has not...
  2. T

    RSJ Installation

    In the midst of a pretty major extension, two storey to the side with two ground floor kitchen walls coming out to create extended kitchin/diner. The RSJ was installed yesterday which spans across the back of the kitchen for about 2 m, then outside a further 2 m to a newly constructed pier. At...
Back
Top