    DPC on single block garage.

    I thought it was normal practice to complete the floor last with strip foundations ?. Yes i will be doing a full slab.
  2. S

    DPC on single block garage.

    I'm well into a block shed project,,and i have the corners in so far. My mate is laying the blocks for me ,and everything looks good,but i think ive made a mistake with the damp proof course. We have layed it on the footings,but i have stupidly realized that it might be useless seeing as...
  3. Untitled

    Untitled

  4. oak trees

    oak trees

  5. S

    footing calculations

    cheers for the replies i need to check my measurements again 6 tonne of ballast and 1 tonne of concrete dont add up considering the amount of material i have dug out.i have been saving a lot of the soil from the dig,for use in some raised beds i am making,i have already filled 1 tonne bag...
  6. S

    footing calculations

    alright, i have dug footings for a single block shed.the length is 56 feet,depth 16 inches,width of footing 12 inches. i dont know how to calculate how much materials i will need,or if the job be to large and have concrete delivered. any help be appreciated. cheers.
  7. S

    PLastering a ceiling

    oooo that jus gotta hurt.
  8. S

    Bad Plastering

    think thats the worse job i have ever seen and that is saying something. they didnt even use skimbeads,on the reveals. get a plasterer in and start again.
  9. S

    Bad Plastering

    Lee, turned my guts reading that mate.your not the first this has happened to and certaintly wont be the last. dont give them a penny,bloody tossers. why not just get a good plasterer in,and start again? your not losing out money wise.look at it as those cowboys were just prepping the...
  10. S

    Skinters

    christ even worse haha hows with you these days busy?
  11. S

    Skinters

    through and through mate ahh listen i dont want no swans v cardiff agro mind haha
  12. S

    plastering speed

    although i have on occasions used one mix to do both coats it does depend on the job at hand. the 2 mix application is still the best and prefered way,imo,and would not want people coming in new to the game thinking it to be normal practice :wink:
  13. S

    plastering speed

    rich, you always so professional :D.i usualy a bit more daring and irresponsible,as i sometimes take the plate off and just carefully press the wires back in lol. i know its bad, :lol:
  14. S

    plastering speed

    looks tidy mate,christ that kitchen goes back in time eh ?
  15. S

    Skinters

    just next door,swansea
  16. S

    plastering speed

    with sockets,i unscrew em out enough to get a trowel behind.i never skim around sockets,makes it harder to take them off if you need.if you can take the sockets off,even better. you will get faster, and the day will come when your the master and not the other way around.dont put to much on...
  17. S

    Old board adhesive

    try a bit of it,if it is not usable ie goes off quick ,bin it and buy some more ,cheap enough.
  18. S

    Walls are plasterboard

    sorry to ask a question with a question,but any reason you want to remove the plasterboard and do the walls behind.if the plasterboard is in good condition it would save you a lot of effort and money. personaly,arriving on a job where any wallpaper etc has been removed before hand is...
  19. S

    How to Approach This? With Pics

    na just bodge it
  20. S

    mixing multi finish plaster

    hahahahaaaa he most prob dont live there no more and that wall has been artex over