Search results

  1. M

    Boiler cycling

    I have a Worcester Greenstar 24Ri boiler that was fitted a year ago. The installer told me that it has a test phase (which appears to take about 2 minutes and 15 seconds) every time the heating switches on, and a pump over-run (which appears to be for 3 minutes) every time the heating switches...
Back
Top