Hi,
I have possibly cocked up my extension slab, here are the details.
My floor construction is as follows,
40mm rejects infill around footings, 150mm MOT type 1, sand blinding, DPM, 100mm Celotex, DPM, 150mm concrete.
The reason for the second DPM above Celotex is the building...