Hi,
I have added a new rad to an existing pressurised system. I had to run the 15mm pipe 10' upstairs to cut into the existing pipes as I could not dig the floor up to reach the downstairs rads.
I have T'ed into the flow and return feed to a rad upstairs.
The problem is that the new rad...