    Footings for a single skin double garage

    Hi All, I am building a double garage and would like some advise on the depth and width of footings needed, it will be a single skin, it obviously needs double skin at the door opening with brick pillars. Cheers Andy :D
  2. U

    Fitting new plastic into existing clay sewer

    Hi All, I am installing a new WC and need to connect into an existing clay sewer that runs outside along the length of the building, can anyone please advise me the best and easiest way to cut into the run of sewer to fit the necessary plastic T piece. :)
  3. U

    Tiling on new screed

    I have just put down 75mm of screed which i have fitted with underfloor heating pipes, i am aware that i cannot have the heating switched on for about 4 weeks to allow the screed to dry but my question is...can i lay my floor tiles before this time or do i have to wait to ensure it has dried out...