Thanks for your reply.
Yes, the 230v is supposed to feed the pcb and coming out from pcb and supposed to feed the terminal block which connected to others. The pumps and timer needs 230v but the power should be supplied by boiler (actually from pcb's external terminal, N and 1) as shown in...