Boiler is 7 years old:
- new February 2004.
- new air pressure switch and control board in March 2008.
- operating normally for 3 years.
Problem 17 days 02/03/11 to 19/03/11:
- the boiler was cutting out an average of once per day with the fault indicator flashing 4 x per second.
- this...