Search results

  1. P

    shower installation and pipework

    Thanks for the advice John, never used plastic before thought that I would give it a go due to the cost of copper, I need to use 9mtr of 22mm in total and never used it before. Also there should be a better flow with plastic taking into account smoother bends.
  2. P

    shower installation and pipework

    Hi I am about to install an Aqualisa Quartz gravity shower in our bathroom. Can anyone advise me, should I use copper pipe 22mm from the top of the hot water cylinder pipe then after 1mtr run the other 3mtr in plastic and reduce down to 15mm when close to the processor/pump unit. Are there...
Back
Top