Search results

  1. J

    air in system

    It is brand new system. Every thing is brand spanking new including the pipe work On the advise of Andy I will take the expansion pipe out of the water in the header tank.
  2. J

    air in system

    It is an open vented system ie small header tank in loft. Installer is involved and is at a loss as what to do. A bypass was fitted. It has been balanced. The expansion pipe has been extended so that it sits in the water in the header tank just incase the system was sucking in air through...
  3. J

    air in system

    I was wondering if anybody can help. I have a brand new Y plan central heating system. ie. New Remeha boiler, pump, 3 way valve, hot water cylinder, rads and new pipework. There is air getting into the system somehow - no leaks- checked every joint when hot and cold- so boiler cuts out after a...
  4. J

    I was wondering if anybody can help. I have a brand new Y plan central heating system. ie. New...

    I was wondering if anybody can help. I have a brand new Y plan central heating system. ie. New Remeha boiler, pump, 3 way valve, hot water cylinder, rads and new pipework. There is air getting into the system somehow - no leaks- checked every joint when hot and cold- so boiler cuts out after a...
Back
Top