Search results

  1. A

    Is under soaker/bonding strip essential under hip tile ridge

    Hi, Re our newly renovated roof: We've had the front and rear left and right side hip joins and main roof ridge tiles secured and bedded with sand and cement mortar mix. However, we've been told by someone that we needed either under-soaker or bonding strips below the Hip tiles...
  2. A

    Is under soaker/bonding strip essential under hip tile ridge

    Hi I've just had a new roof done with double Roman Tiles. But No 'under-soaker or Bonding Strip ' was laid before the hip ridge tiles were put on. Do We now need to take off the Ridge tiles and lay a bonding strip then replace with the hip join tiles ?
Back
Top