Search results

  1. D

    Quickfire Opinions Wanted - Plastering, Plumbing, Patios - Help!

    Not going into the reasons why, but I have to make a quick final decisions on our extension project. As usual I have disappeared down a rabbit hole with my research, so would appreciate a second opinion (or two) to minimise the chances of regrets: 1. Plastering: We are replastering a dining...
  2. D

    Screed Drying for Engineered Flooring

    Hi - could I source your thoughts on concrete drying times suitable for flooring? We've replaced a ground froor slab (44m2) with a DPM, 6" concrete, 100mm kingspan, and 65mm Anhidrite Screed containing a wet loop underfloor heating system. The Screed pour went in 33 days ago, followed by...
Back
Top