Oh and I totally forgot, to add a bit of context, i've done a little map of how the rads are piped up (birds eye view)
starts at 28mm for the first meter or so, then splits into 2 x parallel runs of 22mm, then down to 15mm to each radiator, for the last meter or so.
On setting 4, it was rad...