Yep, spans are almost 3m for the one opening and then 4.5m for the second opening.
Concrete was mixed, poured into moulds and tamped with timber, with the sides being knocked to try and force any air out. Then levelled and left to set.
Ideally I would have just bought them, but unless anyone...