Hi All,
I’m looking for some advice on the best order to lay liquid damp proof membrane, self-levelling compound, and low-profile underfloor heating on an old concrete slab floor. The slab is around 90% intact, with roughly 10% cracked. A photo is attached of the current floor (the water marks...