Search results

  1. P

    1st extension - sewer waste - help please

    Thanks for the feedback & suggestions - have made some edits so think this should work Have included picture of existing sewer & proposed stack. Blockages at the sewer Y on sewer I can rod from new chamber Blockages from shower/basin can either be rodded from one of 2 internal access points...
  2. P

    1st extension - sewer waste - help please

    If I did something like would that be acceptable from a suitable rodding point?
  3. P

    1st extension - sewer waste - help please

    Both the top and bottom of the extension are right on the boundary - so can't put the IC above the existing sewer. I interpreted the BI said I needed an inspection/rodding chamber that would mean all waste from the property needs to be through the IC that can then be rodded. ie I'm not...
  4. P

    1st extension - sewer waste - help please

    These were 2 other ideas I had for layout.
  5. P

    1st extension - sewer waste - help please

    I'm building an extension, and working on sewer plans. We're building over a shared drain and so BI wants new inspection chamber for rodding access. We want a patio, so IC needs to be top right or bottom right. Can you see any glaring problems or issues with this proposal? (shared sewer runs...
Back
Top