  1. R

    Footings, concrete and boundaries

    Hi all. We’ve started a single story kitchen extension this week. Footings have been dug, approved by BC and filled with concrete. We have a shared boundary which runs down the garden. My adjoining neighbour (who we’ve had issues with about the whole project) has a 3m extension which is built...
  2. R

    Single story extension and PWA dispute.

    thanks!
  3. R

    Single story extension and PWA dispute.

    hers is 200mm off the boundary so we have done the same, hence 400mm inbetween builds to account for guttering etc
  4. R

    Single story extension and PWA dispute.

    The shared fence line which establishes the boundary stops just after her extension, so yes her brick wall is visible from my garden. We are leaving a 400mm gap between the build so we are building completely within our, not any shared boundary line which should keep us out of the line of...
  5. R

    Single story extension and PWA dispute.

    Thankfully the building control officer has been on site this morning and has confirmed she is more than happy for us to dig to the same level, which is a win for us. do we still have to serve notice to begin excavations? There’s that much contradicting information out there! thanks all
  6. R

    Single story extension and PWA dispute.

    Of course I haven’t asked to dig a hole on her property. We have dug a trial hole on our side of the boundary to ascertain the depth of her foundations, when if course her head appeared over the fence, and the builder explained to her what we were doing. (no deeper than her foundations) and a...
  7. R

    Single story extension and PWA dispute.

    Good afternoon all, first post here! We're well on the way to starting our new kitchen extension and i'm having a couple of issues with the adjoining neighbour. We've moved in a couple of months ago (Not that this should matter, but gives you a bit of awareness). We bought the house with a...