Search results

  1. Bmitche92

    PD & PP

    Hello Can 2 x new rear extensions (under PP, other under PD) touch and join - both would be behind the original house footprint. I can't get both under PD or PP as one due to volume limits (PD limits / PP greenbelt) Thanks
  2. Bmitche92

    Planning and PD combined

    Hello, So I’ve put in for a planning application to convert a front porch to a double height (removes an awful dormer), change attached garage from flat roof to pitched to match the rest of the house, and a rear double storey. As we’re in Greenbelt council will only allow 30 percent increase...
  3. Bmitche92

    Flat roof dormer condensation

    Have a flat roof dormer which is developing damp patches during this cold weather and cracking in the ceiling - assume this is where the PB joints are but some water is dropping down slowly. It’s foil backed PB and there’s an air gap between the OSB and Kingspan inside the rafters driven by...
Back
Top