I am building a 3.5 x 6.0 metre workshop. The plan is to lay 100mm (4 inches) MOT Type 1 Hardcore, a layer of sand, DPM, then a concert slap of 100mm (4 inches).
I came across this video which sugguest using soil cement or cement-stabilized soil instead of the MOT Type 1 Hardcore. Has anyone...