Building Inspector prefers the first option of the 200mm corner. So of the 150mm cavity, 100mm block.
He also said I would need to "insure i have damp and thermal protection in place". I'm guessing that's a 100mm strip of 50mm insulation CW4050 (or a cut in half CW4100 as being used) to fully...