Search results

  1. E

    New concrete floor drying time

    I have a new approx 4" thick concrete floor (3 weeks old) and am getting grief from my good lady wife about the time required for the floor to dry (1" per month!!!) I do not want to do the final fit on the kitchen until I have the final floor level (ply over floorboards and acrylic / water based...
  2. E

    Cable required 10.7KW hob

    Just in process of changing over the kitchen (part new extension) and have an existing 6mm cable to the hob, but have a new hob which has a rating of 10.7kw. The cable is buried under concrete but is in a conduit, I am thinking the 6mm cable will be a bit on the light side, am I correct. I do...
  3. E

    Installation gap fridge freezer

    I am installing a Hotpoint FFA47X fridge freezer between two full height larder cupboards and do not want to leave a big gap either side of the fridge freezer, can anyone tell me what is the minimum gap to each side. There is a good 24" above for ventilation. Many thanks Mike
Back
Top