Search results

  1. T

    Poorly laid concrete floor

    Thanks for the reply mate. Yeah he laid the floor slab nearly full height and then attempted to float the concrete to the finished level with a fairly thin screed, and it was completely botched, lumpy and bumpy and was probably around 35mm out total from highest to lowest point across 5 rooms...
  2. T

    Poorly laid concrete floor

    Hi all, am having difficulties with the concrete floor laid in my new extension. There have been numerous issues with it, firstly the concrete poured into the extension hardened before it could be levelled off properly. Our builder promised that it wasn't an issue and attempted to fix it...
  3. T

    Issues with combi boiler

    Hi guys, Ever since we had our boiler replaced and had a new combi boiler placed into the loft, we've been having issues with the length of time it takes to get hot water. Our upstairs bathroom which is almost directly below the boiler takes 20-30 seconds to get warm, even with the comfort...
  4. T

    Laying Solid Oak Flooring - Need Advice Please!

    Hi folks, really need some advice here! We've had some beatiful solid oak (18mm thick) flooring sitting in our dining room since December, we're going to be laying it in our open plan living + diningroom and hallway. We've had about 6 joiners out to give us quotes now, every single one of...
Back
Top