All the cables from the CU run through the void, they're all bunched initally and then run off in two directions (mainly), one across the joists/room and one with the joists down the length of the room.
Theres a cooker radial (10mmT/E 30A MCB) approx 20ft
A single socket ring 2.5T/E 30A MCB...