In Cyprus the supplier gives you 30A-3phase 415v.
The electrical designers put 32a mcb for ring sockets and 40A mcb for the floor.
For some time ( not instantneous), the load in the ring or in the floor requires more than 30A.
Which one will trip first the fuse of the supplier or...