Search results

  1. C

    Floor Levelling Compound on top of Floor Levelling Compound

    Thanks Matt, I've got plenty of primer left over - so I'll prime then mix up a whole bag. The whole floor is already covered with the compound, but there just wasn't quite enough to get the depth I needed. About half the bathroom floor is completely flat, but I obviously didn't spread the...
  2. C

    Sound Proofing

    Hi Chirpychippy, Check out these forums for advice and links to other sources of info. http://messageboard.tapeop.com/viewforum.php?f=19&sid=97ccf99e40083148786ae510c60e06c6 http://studio-central.com/phpbb/viewforum.php?f=15&sid=5d27c08cad45b1ea1fb8d17d5be63273
  3. C

    Floor Levelling Compound on top of Floor Levelling Compound

    Hi, I took the advice in the sticky about using Stopgap 700 Flex floor levelling compound on top of the recommended (P131) primer - seems to have worked a treat in my bathroom, on top of solid noggined 18mm WBP Ply. I got one 22kg bag and mixed with 5 litres of water, but there wasn't...
  4. C

    Floor Levelling over WBP Ply

    Hi, I've pulled up the chipboard tongue and groove in my upstairs bathroom, and laid an 18mm WBP Ply sub-floor (solid noggined), ready for ceramic tiles. The joists are not quite level, so there's a slope from the left to the right of the bathroom of about 4mm, with a deeper dip of about...
Back
Top