Search results

  1. S

    main earthing

    Thanks RF that seems to make complete sense to me.
  2. S

    main earthing

    MEB's????? Meaning main earth bonding?? sorry a bit slow. If so this is 10mm installed in mini trunking. Yes thought about the adiabatic equation, i haven't done it for ages. Will try it. The flats are only small 1 bed and very basic.
  3. S

    main earthing

    Hello, just after a bit of advice, (new to testing) What is the minimum size cpc for the following sub mains to a flat. 16mm PVC cable 10mm pvc cable I have completed a PIR on a few of flats that mainly have a 16mm or 10mm t&e sub mains feeding the DB with the earth of the t&e used as...
Back
Top