dot and dad

  1. P

    plasterboard not level need to build up finish

    We have a garage that has been dot and dabbed. It has had rather a lot of board adhesive behind to get over the walls, some areas 1 - 1.5 inch. Along the wall the end board is out of line by around 5-8mm. Whats the best approach to get an acceptable finish, can this be filled out? Any help...
Back
Top