I have a large cemented base for which i have ordered a 4.5m x 2.5m log workshop. I would say that the concrete base is not all that level but not overly bad. I have realised that the workshop comes with bearers that are actually part of the floor base, unlike my shed, which has a floor base on top of 3" bearers. I am a bit worried that as the floor is not completely level, there may be issues in both erecting the workshop and water getting in later through any low spots.
If i mark out the area where the workshop will fit, make a level wooden frame from 1 1/2" timber, fill it with self levelling concrete / compound, do you think that would suffice ?
Could also lay some slabs down underneath or could build it best as can and then silicon around the base ?
If i mark out the area where the workshop will fit, make a level wooden frame from 1 1/2" timber, fill it with self levelling concrete / compound, do you think that would suffice ?
Could also lay some slabs down underneath or could build it best as can and then silicon around the base ?