Upstream being BEFORE....
That'll be downstream of ECV..Hi Terry so how do you remove a meter when you are going to solder onto the outlet of the meter if you can not work on anything before the meter outlet ?
correct steele got the lurgy not thinking straight but the job can be done easily enoughThat'll be downstream of ECV..
Yes that would workG1NZO, ignoring pipework to the right, do you think there would be enough clearance if the meter was just moved downwards as far as it will go WITHOUT disconnecting the flexible stainless steel pipe?
Based on exactly what size your runners are I suspect that it might do.
Tony
i thought i was getting slower but 90 mins ??Would probably take about 90 minutes.
ThanksI think that many RGIs will consider themselves able to do that and make the required modifications to the outlet pipes.
Would probably take about 90 minutes.
Tony
i thought i was getting slower but 90 mins ??
Upstream being BEFORE....
If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.
Select the supplier or trade you require, enter your location to begin your search.
Are you a trade or supplier? You can create your listing free at DIYnot Local