Evening
So I built a single storey rear extension. It projected 7m off the back wall to finish flush with the end of my garage. The garage wall was used as a skin of my extension and therefore classed as a side extension, so I had planning and was completing under a building notice.
Now I have decided to do 2nd storey that will project 3m from the original house. Building control have said I can add it to the notice but would this be considered PD or would I require planning? And it’s going on top of something that’s yet to be signed off?
So I built a single storey rear extension. It projected 7m off the back wall to finish flush with the end of my garage. The garage wall was used as a skin of my extension and therefore classed as a side extension, so I had planning and was completing under a building notice.
Now I have decided to do 2nd storey that will project 3m from the original house. Building control have said I can add it to the notice but would this be considered PD or would I require planning? And it’s going on top of something that’s yet to be signed off?