Building an extension and the electrician has been and first fixed what was planned.
On hindsight I could do with a couple more light switches for the hallway lighting.He as 3 core+E pulled through at either end of the hallway for switching at both ends of hall. I would now like a switch in the ajoining garage and also in the hallway off the existing house.
Am I right in saying I would need 2 intermediate switches and 2 Twin and earths pulled through between the 2 switches? or am I way off the mark. All connections will be made in the switch boxes.
He's quite happy for me to pull in extra cables if I had a change of plan, don't really want to bother him seeing it is easter weekend, but it would enable me to finish the plasterboarding tommorrow.
Cheers
On hindsight I could do with a couple more light switches for the hallway lighting.He as 3 core+E pulled through at either end of the hallway for switching at both ends of hall. I would now like a switch in the ajoining garage and also in the hallway off the existing house.
Am I right in saying I would need 2 intermediate switches and 2 Twin and earths pulled through between the 2 switches? or am I way off the mark. All connections will be made in the switch boxes.
He's quite happy for me to pull in extra cables if I had a change of plan, don't really want to bother him seeing it is easter weekend, but it would enable me to finish the plasterboarding tommorrow.
Cheers