Im doing some theory work for college and just want to run a couple of things by you guys if you dont mind:-
In Mr. Jones' house I need to add some lighting and power into a new shed, there is an existing shed about 500mm, what I was going to write down was:-
The picture shows the existing shed has power (socket, no light) from this I would extend the ring / radial into the new shed (using twin and earth linking the 2 sheds) to supply the new sockets, for the lighting I would incorporate a 13Amp fused spur and on the load side I would wire to a switch and then out to the new lights. (Again I would need to run the cable accross the gap between the 2 sheds)
Would that be ok?
Next, with bonding in the bathroom I read it should be connected to the lighting circuit, is this good practice or a requirement?
Thanks for your time
In Mr. Jones' house I need to add some lighting and power into a new shed, there is an existing shed about 500mm, what I was going to write down was:-
The picture shows the existing shed has power (socket, no light) from this I would extend the ring / radial into the new shed (using twin and earth linking the 2 sheds) to supply the new sockets, for the lighting I would incorporate a 13Amp fused spur and on the load side I would wire to a switch and then out to the new lights. (Again I would need to run the cable accross the gap between the 2 sheds)
Would that be ok?
Next, with bonding in the bathroom I read it should be connected to the lighting circuit, is this good practice or a requirement?
Thanks for your time