Hello,
I am hope someone can help me.
I am currently having an extension built on my property. The property has a block and beam floor and the brick work and block work are currently at about 1 meter high. Over the weekend I have been measuring out in the garden for the patio etc.. and noticed that the DPC has been installed a brick higher in the new extension compared to the existing property (the existing property was built in 1990 and you can clearly see the DPC).
What I am considered about is dampness bridging the different DPC at different heights. Why do you think this was done? Any thoughts or advice would be greatly appreciated.
Thanks Sp001
I am hope someone can help me.
I am currently having an extension built on my property. The property has a block and beam floor and the brick work and block work are currently at about 1 meter high. Over the weekend I have been measuring out in the garden for the patio etc.. and noticed that the DPC has been installed a brick higher in the new extension compared to the existing property (the existing property was built in 1990 and you can clearly see the DPC).
What I am considered about is dampness bridging the different DPC at different heights. Why do you think this was done? Any thoughts or advice would be greatly appreciated.
Thanks Sp001