Hi,
Recently moved into a house where a lot of the render is knackered. Rather than patch up the knackered bits we're considering having it all redone (it's ugly rough stuff at the moment).
We had a local guy quote to hack it off and re-do it. He's quoted £14k to do it in sand + cement and that doesn't include painting or scaffolding.
I reckon it's about 200m2.
This was quite a bit higher than I was expecting. He said it would take about 3wk, which even allowing for 2k materials works out at about £114/hr (for 1 person).
What do others think? A lot or about right? Ta
Pic of the house:
Recently moved into a house where a lot of the render is knackered. Rather than patch up the knackered bits we're considering having it all redone (it's ugly rough stuff at the moment).
We had a local guy quote to hack it off and re-do it. He's quoted £14k to do it in sand + cement and that doesn't include painting or scaffolding.
I reckon it's about 200m2.
This was quite a bit higher than I was expecting. He said it would take about 3wk, which even allowing for 2k materials works out at about £114/hr (for 1 person).
What do others think? A lot or about right? Ta
Pic of the house: