just screwed new ply down on to existing floor boards in the bathroom and started marking out ready to tile but found out one side of the room is 50mm lower than the other side
can i just use more adesive on the low end to build it up?
also the existing shower try is is sat on the floor boards so it is also falling and there supposed to be level arnt they?
anyway its falling towards the drain so the water will get away but should i take it out and re-level it or should it be ok?