When fitting a new gas supply to a gas hob (t into existing 22mm supply to boiler) should the working pressure be taken at the meter and then at the boiler (with hob running full) to ensure the hob isn't causing a problem with the gas supply.
I had a gas fitter out today to install a new gas hob but he said all of the above and that the gas supply might need to be upgraded to ensure the correct volume of gas was reaching both boiler and hob.
I had a gas fitter out today to install a new gas hob but he said all of the above and that the gas supply might need to be upgraded to ensure the correct volume of gas was reaching both boiler and hob.