hiya
any opinions on this?.........
"In putting this quote together for you, we have had to make a couple of assumptions, if these are incorrect then the quote can be modified accordingly;
* We assume that you already have a gas connection at the house (if not please say, as we can help you with the process to get one)
* We assume that you have a gas meter and a supplier (ditto)
Our quote is based around a good quality boiler with a good reputation and an outstanding 5 year full parts and labour warranty;
We would;
* Remove and dispose of old heating equipment in the house as required by you
* Make good any pipework configurations in anticipation of a combi boiler system design
* Design and build a central heating circuit in 15mm soldered copper tube
* Supply and fit up to seven high quality compact radiators, each with a thermostatic head for individual zone control
* Supply and fit a chrome heated towel rail for the bathroom
* Supply and fit a Worcester Bosch 25 Si 'A Rated' condensing combi boiler with a 5 year warranty
* Supply and fit a Worcester flue, earth cross bonding stip, and a digital multi programmer
* Flush and clean the system in accordance with Worcester installation instructions
* Commission and certify the system
* Register the boiler with your local Building Control department (Part L Building Regulations requirement)
Our all-inclusive, no nonsense quote for this work is £3,300
Supplied with thanks, and hopefully will speak to you soon.
Kind regards"
any opinions on this?.........
"In putting this quote together for you, we have had to make a couple of assumptions, if these are incorrect then the quote can be modified accordingly;
* We assume that you already have a gas connection at the house (if not please say, as we can help you with the process to get one)
* We assume that you have a gas meter and a supplier (ditto)
Our quote is based around a good quality boiler with a good reputation and an outstanding 5 year full parts and labour warranty;
We would;
* Remove and dispose of old heating equipment in the house as required by you
* Make good any pipework configurations in anticipation of a combi boiler system design
* Design and build a central heating circuit in 15mm soldered copper tube
* Supply and fit up to seven high quality compact radiators, each with a thermostatic head for individual zone control
* Supply and fit a chrome heated towel rail for the bathroom
* Supply and fit a Worcester Bosch 25 Si 'A Rated' condensing combi boiler with a 5 year warranty
* Supply and fit a Worcester flue, earth cross bonding stip, and a digital multi programmer
* Flush and clean the system in accordance with Worcester installation instructions
* Commission and certify the system
* Register the boiler with your local Building Control department (Part L Building Regulations requirement)
Our all-inclusive, no nonsense quote for this work is £3,300
Supplied with thanks, and hopefully will speak to you soon.
Kind regards"