I had a gas leak from the pipe going to the Fire and the gas man has renewed the pipe in the floor nd covered it with concrete after rapping it with some tape.
But...... I noticed when he was putting it in he was using copper pipe. I asked him if this was OK and he said it was and that the joints were OK because the installation code had been updated in 2008. ????
But...... I noticed when he was putting it in he was using copper pipe. I asked him if this was OK and he said it was and that the joints were OK because the installation code had been updated in 2008. ????