I am changing my bathroom radiator to a chrome ladder one and want to have the new 15mm chrome pipes dissapearing thru the floor, where I will connect to the existing 10mm radiator pipes.
I have all my new pipework ready and just need to make a break in to connect up and was looking to do this without draining down the system.
I will obviously turn the syatem off well in advance but what else should I do to minimise the water loss?
I have all my new pipework ready and just need to make a break in to connect up and was looking to do this without draining down the system.
I will obviously turn the syatem off well in advance but what else should I do to minimise the water loss?