Having had a combi boiler fitted, I no longer have an immersion heater and this supply (2.5mm T&E direct from CU) is therefore now available.
I'm toying with the idea of taking this up into the loft space and using it to run a series of FCUs. One of these would supply an aerial amplifier in the loft, the others (all RCD) would feed back down to 2 sets of underfloor heating + shaver socket (bathroom + en-suite).
I estimate the total load to be less than 800W so I can't see any problem there, and due to the location of the normal ring circuit it would be far more convenient to wire this way.
Is there any reason (particularly regs!) why I shouldn't do this? Obviously I'll need to get a qualified sparky when it comes to the actual bathroom wiring, but at the moment I'm just concerned with getting the cable routes sorted. I don't want to go to all the hassle of putting in the conduit etc. only to find I can't run this many FCUs off a single feed.
Many thanks
I'm toying with the idea of taking this up into the loft space and using it to run a series of FCUs. One of these would supply an aerial amplifier in the loft, the others (all RCD) would feed back down to 2 sets of underfloor heating + shaver socket (bathroom + en-suite).
I estimate the total load to be less than 800W so I can't see any problem there, and due to the location of the normal ring circuit it would be far more convenient to wire this way.
Is there any reason (particularly regs!) why I shouldn't do this? Obviously I'll need to get a qualified sparky when it comes to the actual bathroom wiring, but at the moment I'm just concerned with getting the cable routes sorted. I don't want to go to all the hassle of putting in the conduit etc. only to find I can't run this many FCUs off a single feed.
Many thanks