Hi,
I am trying to fit a shower tray but the waste trap falls directly over the joist. I need to cut a 20cm length by 15cm depth in the joist. The joist is 20cm in depth. Can anyone recommend a way of strengthening the remainder of the joist to allow the cut? Or better still recommend a waste that can be fitted over the joist and only requires 5cm or less clearance (e.g diverted waste trap?).
Thanks.
I am trying to fit a shower tray but the waste trap falls directly over the joist. I need to cut a 20cm length by 15cm depth in the joist. The joist is 20cm in depth. Can anyone recommend a way of strengthening the remainder of the joist to allow the cut? Or better still recommend a waste that can be fitted over the joist and only requires 5cm or less clearance (e.g diverted waste trap?).
Thanks.